Problem regarding usage decision is done by other plant
We have four plant in our company in one company code then usage decision is done by other plant then same plant .How we restrict usage decision is not done by other plant.Please give me solutions.
View ArticleAutomatic valuation in inspection lot
Hi QM guys, I struggle with QM and couldn't find a good solution on my own. Maybe you can help me with the scenario I have: I have product where I assigned Inspection Type 04 & 09 to the Material...
View ArticleReturn Inspection process - Issue in PGR
Dear all, In return process inspection from a customer using Inspection type - "05", while creating "Post Goods Receipt" for the out of warranty order, system is throwing an error...
View ArticleWarning Message no. QE404 during results recording
Dear All, during results recording I have noticed that if the results is too much out from specification limit then it give a warning msg "The input value 0 is too small. Check your entry" or "The...
View ArticleClass Characteristics Assignment to MIC
Dear All, while assigning the class characteristics to MIC the Upper and lower limit in control indicators are disabled. how can i make them enable to set both upper limit and lower limit indicator...
View ArticleDear sir, where do i get the recorded result numerical data? in which table?...
Dear sir, where do i get the recorded result numerical data? in which table? I did not found numeric data in Table - QASE ?
View ArticleCreate Q3 Notification during F1 Creation
Hello Experts, I have one requirement.My Client wants while creating F1 Notification, Q3 Notification also created automatically. Right now they create Q3 Notification after F1 create Manually.But they...
View ArticleTECO work order but inspection lot still is released
Dear all, I'm testing inspection process 03. I have two questions and need your help.Q1, By my logic, the normal process should be that, UD code should be given after full withdrawn work order. But...
View ArticleSubsequent credit with respect to quality result
Hi, We have a raw material as sunflower seed. When we make the PO and When the goods receipt is being done by the user a quality inspection lot will be generated, user will enter the quality results....
View ArticleMultiple Specifications in QM
I started a discussion on multiple specs over under the Chemicals space. It's very related to QM obviously so I hope that those of you who have used multiple specs or have considered them for an...
View ArticleStability study: create a strategy with not regular packages
Hello dear experts, I need to create a specific stability study strategy and I am having some problem. The requirement is the following:for a specific storage condition (so I don't have the case of...
View ArticleInspection lots without Task list
Hi, Can we create a inspection lot for plant maintenance without assigning any task list to it? Do we have any other area where we can assign MIC's to operations apart from task list in an inspection...
View ArticleResult Recording Inspected Quantity
Dear Team, I am New in QM. Now I have one question. I have created production order with Order Quantity 2 One inspection lot gets generated with inspection type "03". Now i want to record the result...
View ArticleError in QC03?
Dear All QM experts, please help me to solve below error on urgent basis. Previously this error was not arises but from 3 days it is showing same error for all. I have checked Inspection lots in QA32...
View ArticleBatch 09 - without inspection lot - Urg !
Hi,We execute QA07 for periodic results with the "Block batch at inspection date" and because of that some batches were moved to "block stock" without inspection lot generation. Now, I cannot moved...
View ArticleField for user-specific entries (Inprocess Insp)
Dear all we have activated inprocess inspection (insp type 03), and also using the user specific fields like date , time and others for some data entry , can we add / assign any help (catalog) in user...
View ArticleInconsistency MM and QM after 102 booking
Dear all, I've a question regarding differences in QM and MM. We generate an inspection lot with type 04 using early lot creation (at release of process order). This means that the inspection lot...
View ArticleCustomer Return
Hi All, I have implemented customer return by inspection type 06, process is running fine.If lot is rejected i move material with 459 to block and if lot accepted with 453, i move to unrestricted.My...
View ArticleQM with different Testing flow for Pharma
Hi Guru jis, Can any one any help me to run the QM process flow for Pharma industry. I'm New to this QM process so it would be really helpful if you could share any real time scenario or document....
View ArticleMB5M - Does not display batch stock in blocked or restricted
Currently when I'm running MB5M report it does not display batch stock which are in blocked or restricted status. Is this SAP standard functionality? How can I display blocked or restricted batches in...
View Article