Hello dear experts,
I need to create a specific stability study strategy and I am having some problem.
The requirement is the following:
for a specific storage condition (so I don't have the case of several, different storage conditions) the strategy must foresee the following inspection intervals:
- for the first year, an inspection every 3 months
- for the second year, an inspection every 6 months
- then, an inspection every year
How could I set up this in the system?
And where do I set that I want to finish after 4 years?
Thanks for the help,
Giovanni