Assigning an Inspection Specification
Hi,I need to assigning an Inspection specification to a material automatically. Regards,Ahmed
View Articleclarifications in QM info record
Hi, In the QM info record i have some issues... A) In the QM info record in the insp. control tab we have Existing QM system and Vendor 's QM system.....what is the difference between these...
View ArticleControlling the Rejection
Hi Experts! Could you explain me about what is Controlling Rejection? Thanks in advance.
View ArticleOperation Master
We are working in a Project, where the client wants 1. To put the operation in the inspection plan and that automatically the master characteristics are created, for my understanding is kind of a...
View ArticleSAP QM-CAPA(Corrective and Preventive Action)
Hi SAP QM Gurus, Please explain me about SAP QM - CAPA (Corrective and Preventive Action) functionality. Is it an add on module or add on functionality in SAP QM or it is a separate sub module. Please...
View ArticleLIMS Interface error
Hi Gurus, We are currently implementing LIMS for our laboratory and integrating with SAP. we are doing it for our raw materials and semi finished materials. we do not have any issue with our raw...
View ArticleCharacteristic is closed without Results Recording
Hello All, For a particular inspection lot characteristic is automatically closed without results recording The operation was not opened for RR, but system grayed it out without any activity, is there...
View ArticleCAPA in QM
Hi, Has anyone successfully implemented CAPA in SAP via the notifications for an FDA regulated industry ? I have seen it usually done in a 3rd party system like Trackwise and then Trackwise creates...
View Articlein process inspection
Hi, I have 6 opns in the routing and the 3rd and 5th opns have inspection on them. I get the 03 lot created when I goto QE01 to record the results I see all the 4 opns with the yellow triangle. Then...
View ArticleDynamic Sampling Procedure
Dear gurus,I have a requirement, my client wants to achieve a scenario for inward inspection. For Vendor-Material-Plant combination they want to do 100% inspection for some fixed number of lots (Say...
View Articletable QAMR not showing correct status
Hi Team, Good day!I would like to request your assistance, when we do the transaction QE51n all of the characteristic pass the recording and current status are 5 (Processing is completed). However,...
View ArticleHow to get CP and CPK in MCXD Report
Dear Sir We have set SPC indicator in Master data inspection plan and assigned sample procedure but we are not able to get CP and CPK in MCXD report
View ArticleRestrict change in usage decision- SAP QM
How to restrict changes in usage decision after the lot has been posted in SAP?
View ArticleQA11 stock postings to reserve VMENGE05 - message M7042
Witam, Configuration:1. SPRO->Quality Management->Basic Settings->Maintain Settings at Plant LevelOn tab "InsLot completation" default storage location fro reserves = X 2. SPRO->Quality...
View ArticleInspection lot valuation for in process inspection
A confirmation process contains three operations. I have assigned MIC to second and third operations and inspection type 3 is activated. When a production order is released and confirmation is done, I...
View ArticleAutomatic QM order creation
Hi All Iam using lot type 08 and it has individual QM lot selection in material master.At plant level settings QM orders are maintained. When i do transfer posting with 349 E movementin MiGo then...
View ArticleREGARDING INSPECTION LOT
Dear Guru's, I am facing a issue for 1 inspection lot. Can you plz help me out for below issue. I have a inspection lot say XXXXXXXX and having status " PAOR REL CALC SPRQ". But system is not...
View ArticleSPC Criterion for single control chart for each inspection lot
Hi,I want to generate separate control chart for each inspection lot... I have fixed sample size of 3 and will do individual recording and want to plot this values in single control chart for each...
View ArticleAutomatic Inspection Characteristic Valuation
All, how can I setup SAP to do an automatic valuation for each MIC during results recording after closing the inspection. I have an inspection lot with 60 inspection charcateristics and the user...
View Articlecertified vendor stock going in to blocked stock instead of unrestricted stock..
Hi,I have a material procured from a vendor...activated inspection type 01 in the material master....now for this material QM procurement is active....and Target QM system maintained as 9001....created...