Quantcast
Channel: SCN : Discussion List - SAP ERP Operations - Quality Management (SAP QM)
Viewing all articles
Browse latest Browse all 2825

in process inspection

$
0
0


Hi,

    I have 6 opns in the routing and the 3rd and 5th opns have inspection on them. I get the 03 lot created when I goto QE01 to record the results I see all the 4 opns with the yellow triangle. Then I select the second opn (first with the yellow triangle) and do my results rrecording.When I valuate my MIC as accept and save the lot, the system immediately shows me the 5th opn to record results against. I dont want that to happen as I still need to book my manufacturing time on the 3rd opn, comfirm and complete the 4th op and then goto the 5th op. How do I restrict the system from jumping to the 5th manufacturing opn ? Do I need inspection points to "tie" in quality activities with the mfg activities on the same opn ?

 

Thanks


Viewing all articles
Browse latest Browse all 2825

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>