How to create FMEA and Control plan in SAP ECC 6.0? We want to use this facility in our organisation. Pl help.
FMEA and Control Plan creation SAP
Requirement to confirm receipt of documents before GR
Hi All,
There is a requirement to receive documents first from vendor and then contact the vendor for delivery , the system should not allow GR if the documents are not received , also there should be a checklist where the user records that all documents are received, then the GR should be available to be posted , I have developed a solution where the quality certificate is blocking the GR and there should be certificate inspection and filing before the GR can be done but the thing is that the inspection lot in this case is created after the GR , i need an inspection lot to be created before the GR , source inspection can be implemented but the issue is that when making the UD , the lot is asking for batch which is not the case , is there a work around for this
Thanks in advance
Is there any standard Bapi for Defect Recording
Hi all,
For defect recording any standard BAPI or RFC enabled function module is available?
Using QIRF_GET_DEFECT_ITEMS2 it possible ?
Thanks,
Arun
Early lot creation by product
I've a question about inspection lot creation for by-products (co-products). During production we use the 04 for the early lot creation. So at process order release we create an inspection lot. Sample labels will be printed immediately.
During production a by-product will be received as well. The batch number for this by product is known at process order release. I know it's possible to create an 05 inspection lot when the goods receipt of the byproduct is performed. But what i'd like to have is that the inspection lot for the byproduct is created at the moment of process order release. The type of inspection lot is not relevant (04 or 05).
So in the end i'd like to end up with two inspection lot. 1 For the main product in the process order and 1 for the by-product.
Is this possible with a note or do I need to make an enhancement?
Thanks.
How to link table QASE and field PPLNKN (Number of the task list node)
Hi all!
I have to add field PPLNKN (Number of the task list node) to table QASE.
Any idea from which table to derive the field? I only see its been used in several structures but I can not find any base table that contains the field to join it to table QASE.
Furthermore, any information what exactly "Number of the task list node" means would be helpful.
Thank you!
Regards
Marco
Certificate profile
Hi,
I have a question regarding certificate profile and the characteristics origin from the production chain. In the inspection lot for the HALB material there are some charachteristics that are skipped, is it possible to get these characteristics from the ROH material then? Do I have to write a FM for the skip strategy or? I have maintained the material list but for now the characteristics from the HALB material is printed even if they are skipped!
BR Kat
Notification status in OSNO even after UD
Hi guys.
Even after giving usage decision for inspection call, the notification status still remains as OSNO (Outstanding Notification) instead of NOCO (Notification Completed).
This case is happening for a new plant configured in our SAP system (ECC 6.0 EHP5).
What may be the reason for this problem?
Error while making UD for AFS material
Hi all,
While returning quantity to vendor at the time of making usage decision for AFS material via QA11 transaction I am getting an error message "Entry 4500000226 00010 0000 not valid; correct entry Message no. 8J182". Whereas when the quantity is returned to vendor for non AFS material via QA11 transaction I am not getting any error message. Can anyone tell me why I am getting error message only AFS material. Thanking everyone in advance for feedback's and suggestions.
Regards
V. Srinivasa Ranganath
SAP QM for Procurement Presentaion
Hi QM experts,
I am looking for a QM for Procurement power point presentation. Do you have any documents that you can share? Thanks.
FMEA and Control Plan creation SAP
How to create FMEA and Control plan in SAP ECC 6.0? We want to use this facility in our organisation. Pl help.
Results Recording valuation icon
Has anybody found a way to enhance the valuation icon that is displayed for individual results? The standard is a green check if the result passed and a red X if the results failed. We are wanting a third icon to represent if the result is between 1st upper limit and upper spec, or between 1st lower limit and lower spec (we call these "action limits"). The valuation would still remain accept, we just want a yellow icon or something as a visual warning to the user.
We currently have the functionality generating a warning message (very similar to the out of plausibility limits message) via BAdI QE_RESULT_VALUATION,. However, this message is causing problems in a mass inspection point copy transaction we are building. Thanks for your input!
Control Plan and FMEA
Hi,
What is the use of control plan....for what scenario it is used.... when it is used....how it is linked with FMEA....sometimes inspection plans are created from control plan is that correct...
Can somebody help me out....
Thanks
Kumar
How to integrate four point evaluation for Fabric in SAP
Hi All,
One of client's requirement is that they want to use 4 point evaluation system of Fabric in SAP. Can anyone tell how to integrate 4 point evaluation system with SAP.
Regards
V. Srinivasa Ranganath
Return to vendor using UD screen for sub contract part
Hi all,
We are getting an error while during return to vendor after rejection using UD screen (QA11). This is a subcontract item.
The error message is "Incorrect posting back to vendor. error message Of the required quantity of material ABC, X remain(s) open."
Basically I understood the error message. System is expecting child part batch number.
My question is where to give child part batch number in QA11 screen for this scenario? or how to get out of this error?
Regards,
R. Srinivasan
audit trail for inspection results
Hello,
this is one of those things which in theory should be in place and easy but I can't find it...
Let's say that our lab tech Josie is entering results; she's tired and makes a typo. Then upon review this is detected and updated, either by Josie herself or by her supervisor Chris. Other than entering the correct result as an "additional inspection", is there a way to see who entered the erroneous result, when and who it was, and the change?
Thank you in advance,
M 8A
QM action box authorization
Hi Gurus,
I'm building my authorization profiles, I need to give to authorization for the action box of the quality notifications, what authorization object or transaction should I search.
I gave the user transaction QST01 (for creating stability studies) but the action box was not complete, I got only the 1st 2 actions.
How can get the rest of the actions?
Regards,
MaX
Inspection lot 030000054624 for order 10155798 has not yet been completed
Inspection lot 030000054624 for order 10155798 has not yet been
completed
Message no. CO440
Diagnosis
If an order contains inspection lots, you can
only activate a deletion flag or complete the order, if each inspection lot has
the status 'Completion of all inspections set' and 'Usage decision made'.
Procedure
To activate a deletion flag in order 10155798 or complete this order, you
must first change the status of inspection lot 030000054624.
Order had been TECO and Settled, now only could not close and set deletion flag, I face error message as showed, any advice to solve it?
How to set up formula in inspection characteristic with IF, THEN, ELSE function
Dear Expert,
I need to setup the calculated characteristics for beloe scenario
The first MIC contains the measured temperature.
The second MIC shoud calculate, based on the temperature of the first MIC,
SAP Standard accepts IF, THEN, ELSE functions in formulas.
My problem is: How can I calculate in one forumla the desribed problem (how has the formula to be set up in detail):
If the temperature is between 12.5°C to 16.5°C then give back the value 8.05
If the temperature is between 16.6°C to 19.5°C then give back the value 8.03
If the temperature is between 19.6°C to 21.0°C then give back the value 8.02
If the temperature is between 21.1°C to 23.5°C then give back the value 8.01
If the temperature is between 23.6°C to 27.5°C then give back the value 8.00
If the temperature is between 27.6°C to 32.5°C then give back the value 7.98
Please help to suggest the ways.
Regards,
Sandeep
Error During QA32
Dear All,
We are getting following error during UD .
********************
Enter a material
Message no. M7014
Diagnosis
The material number is necessary for document selection.
Procedure
Enter a material number (it is possible to enter an interval).
If you do not know the material number, press F4 to search for it.
*********************
Thanks and Regards,
Nirav
Selected set multiple boxes in MIC
Hello
I have a query regarding the selected sets assignment in the qualitative mics. While assigning a set to mic, I have seen other boxes there. What are they for? Do they mean I can assign multiple sets to a mic and do the RR based on them.
KJ