UD
Hi, User has lot quantity of 1000.Out of 1000 he has taken UD for 560 qty. Now he wants to take ud for rest of the quantity.Now UD reversal is not possible.What will be the solution?? Regards,Vivek Malik
View ArticleFMEA not getting assigned to control plan
Hi,I am creating a control plan and trying to assign FMEA to it but getting below error No Characteristics Included... how to resolve it.... ThanksKumar
View ArticleLong text in QA32
Hi Gurus, In QA02, we maintain the description in short text and if the description is long it is maintained in the long text. Some portion of the long text is copied over to the short text. The short...
View ArticleInspection lot UD reversal for calibration orders
Hi,We have calibration inspection where inspection lots are generated for which RR and UD done and after that PM calibration orders are closed. Now due to some issue without doing RR they did UD for...
View ArticleMass change inspection plans
Hello, I'm looking for a possibility to insert a characteristic in 1000 plans.The new characteristic "B" is needed in every plan who has a characteric "A" yet. So it's no problem to find the relevant...
View ArticleSAP QM - QC21/22
Dear QM Gurus, Im not getting product name data when I run QC21/22 - only getting the product number. Is this standard or can we do something to get the product name displayed on the QC. Kindly advise...
View ArticleNumber of Tabs Quality Notification?
How may tabs can be shown on "level10" in Quality Notification via QM01? In QCC1 I setup 10 tabs.. but not all are shown in QM01.
View ArticleVendor assigment to be deleted in MAss from inspection plans
Dear All,I am stuck up at one point.We want to remove Vendor assigned from Number of Inspection plans having Multiple counters and multiple materials.It is not getting recorded in LSMW,as if I take...
View ArticleReg. Inspection Lot status SPRQ Missing
HI All, I have an issue in QM where i do GR against Purchase order and Inspection lot created.My setting in the material master are QM view are1. Inspection type - 012.Post to Insp. stock -...
View ArticleContinuous update of SPC control limits
Hello, Can we update the control limits automatically after each results are recorded? Means after result recorded for each inspection lot automatically system should update control limits in...
View ArticleInspection lot status
Hi All,I have a issue in Inspection lot status.I see for those inspection lots which are cancelled it has status for I0203(SPRQ) as X which is inactive in table TJ02T. Rest other status are active. Is...
View ArticleDelivery number in QALS table
Hi experts, I want to know at what circumstances the field LS_VBELN (delivery) is filled for inspection lot in table QALS. I tested a scenario where Inbound delivery with HU was created for PO and...
View ArticleSample Results --- LIMS to SAP transfer
Hello QM Gurus, I have never worked on a LIMS to SAP interface before. But currently, i am working on one such interface where results of Physical Sample are to be transferred from LIMS (CCLASS) to...
View ArticleStock Posting :- UD
Hi, In below screen shot stock has been posted to unrestricted is 1555 qty.Remaining 3710 is to be posted. But UD is already done for this lot.How i can post remaining 3710 qty to unrestricted?
View ArticleVV21 - Condition Record
Hi colleagues, We are facing one issue, in condition record we created sales.org/distr.ch/Divison/deliv.type/ship-to Pt/Material and maintain material codes and mail ids, but when we performing PGI...
View ArticleInspection Lot generation while posting stock from quality to blocked.
Hi,Gurus, Our client want when they are rejecting an inspection lot and doing stock posting from quality to blocked stock a new inspection lot should get generated for the material posted to blocked...
View ArticleSerial Number issue
Hello, I have never worked in the module QM before. Today a client had an issue (post-upgrade) about the serial number not being displayed in stock movement. More details: Transaction QA32, I put my...
View Articlevendor evaluation and Wt. %
Dear AllWe are working on Vendor evaluation based on parametersQuality (40%)Price(25%)delivery (25%)Service (10%).Now we observer that in case Quality lot is not made being Quality not activated then...
View ArticleTraffic lights in the task list Quality notification?
Is it possible to include "traffic-lights" in the task list of a Quality notification or do I have to use a report for this?
View ArticleInspection lot restriction
Hi,I need to restrict the cancellation of inspection lots of other plants.How can I do that and what are the authorization objects that we need to look into it.
View Article