BAPI or FM for Material Assignment in QM Inspection Plan
Hi QM Gurus, Is there a possibility of using the BAPI or an FM - CZ_BT_MAPL_APPENDto append a new material (material assignment) to an existing QM Inspection Plan? if yes, kindly explain. Note: This is...
View ArticleInspected stock posting to multiple storage location without batch
Hi,At the time of Usage Decision, I want to post the inspected stock to multiple storage location i.e., Rejected Stock to Scrap Storage Location, Qualified Stock to Unrestricted Use Storage...
View ArticleUD reversal with QEVA0008
Hi, The button label (+FC1) needs to be Dynamic.For eg:changed to say “Reverse UD” instead of “Confirm UD” if the t-code is QA12 or QA14. RegardsNeha
View Articlehow to restrict the usage decision
Hello To All, I have a semi finished material. In Material Master (QM view), I have selected 04 inspection type, and maintained the Average Inspection Duration to be 20 days.Now my question is , how to...
View ArticleInspection lot status is UD ICCO SPCO STUP but stock is in quality
Iam PP/MM consultant have basic idea in QM module, need your suggestion in resolving the issue.I have a product which is struck in Quality stock for almost a year.Inspection lot created with inspection...
View Articlesample receiving time & clearance time
Dear QM gurus, My client is having a requirement of mentioning sample receiving time and sample clearance time while doing result recording so they can evaluate how much time it took for giving the...
View ArticleAutomate Usage Decision of Inspection Lot when material is moved out of one...
Hi guys, I have a business scenario. We receive a production material from a different location into plant via trucks and immediately move the stock into a storage location A in the plant. Once the...
View ArticleMovement type and Inspeceion Plan group assignment
Dear All, We have a number of customized movement type 311. Depending upon the requirement,numbner of inspection plan are existing. We need to assign the specific movement type and inspection plan ....
View ArticleResult Recording - defect is recorded. Need to create Rework order with...
Dear All, After entering the defect in result recording screen, need to create Rework order with reference to inspection lot number particularly for stock transfer inspection type 08. Please provide...
View ArticleSap IDES Installtion process and needed softwares and documents
Hi friends, what is the difference between SAP IDES system installation and normal SAP installation.. what softwares and documents need to dowload for Ides and from where I can dowload it(path).. if...
View ArticleQI06 - No suitable material/vendor combinations exist
Hello Craig, Could you please provide more details regarding this part: "is required by the control key"?Which setting in QM Control key means Quality Info Record is mandatory?I know that for 0000 it...
View ArticleInspection type 06(customer returns) is not allowing result record and UD
Hi all,I am facing a problem from past 5 days that system is not allowing me to record result for inspection type 06 as i have maintained1. Inspection plan from usage 062.assigned task list usage 06 in...
View ArticleSAP QM - Add Entry in SPRO - Define Inspections in Plant Maintenance
Dear QM gurus, SPRO - QM - Quality Insp - Insp Lot creation - Define Inspections in Plant Maintenance I want to add entry PM07 in Plant 5625.I do not see any New Entries Option - how to add this ?...
View ArticleEHP 5 Vs EHP4 for stability study
Dear All, We are using ECC-6.0 ,EHP-4, We want to know what additional facility is there in EHP-5 compare to EHP-4 for quality module ,basically for stability study..Can any one help me out with...
View ArticleProblem with QC16 and QC03 - Certificate profile Issue
Hi Experts, Step 1 : in QC16 tocde, the material and customer combination is assigned to 2 Certificate profiles. I have checked these two certificate profiles separatly in QC03 tcode and found the same...
View ArticleDock material to stock if material has no issue with quality
Good morning guys,I have just started with QM, so please kindly guide me. We have materials that are being activated to Inspection. So we when to MM02 and added the inspection type 01-Goods Receipt...
View ArticleHow to Implement Dynamic Modification Rule for Material & multiple vendor...
Hi Team, In dynamic modification rule for Material & vendor combination, i have maintained material & vendor in Inspection plan at Material Assignments 1.If i purchase same material from...
View ArticleExclude one storage location from recurring inspection
Hi All, Is it possible to exclude one storage location from recurring inspection? As i have already referred the below post for the same. Inspection Lot If it's not possible in standard...
View ArticleNo UD without Result Recording
Hi Guru's, My requirement is that, If Valuation was NOT OK during Result Recording than UD will not happened without defect recording.Kindly guide me how to achieve this. With Regards.
View ArticleFailing to do results recording
Team, I am failing to do the results for an inspection lot. the inspection plan of the material has quantitative characteristics yet am getting the message below: What areas/fileds am i supposed to be...
View Article