Quantcast
Channel: SCN : Discussion List - SAP ERP Operations - Quality Management (SAP QM)
Browsing all 2825 articles
Browse latest View live

single characteristic result problem

Hi Gurus,I wanna check inspection lot characteristics via zreport. I use QASE table for query and it works ok, but i cant see records in QASE table for single quantity inspection lots? Where can I find...

View Article


Add multiple tasks from one Quality Notification action item click

How can we add multiple tasks into a Quality Notification against click on just one action item. Please suggest ways to do so.

View Article


QN Quality Notification Completion Flag

We're having an issue with users erroneously checking the QN complete flag instead of highlighting their task rows and checking those for being complete. Is there a way to configure the QN screen to...

View Article

Stock still in QI after UD

Hello, I have used the move type 101 O (stock provided to vendor) and it did created the inspection lot as expected after activating the movement type for QM active however stock still in QI after UD...

View Article

vendor evaluation criteria rejects/complaints

Hi,    I have configured the vendor evaluation to look at the rejection/complaints sub criteria with the scoring method as 8 = Automatic Determ. from Quality Stat.: Quality Notification. The first time...

View Article


LOGLINE in the Notification's long text

Can the content of the Notification's long text "Log Line" be changed? Standard SAP gives: Date, Time, Username, SAP User ID and Phone numberRequirement is to add "User department"  the log line. Would...

View Article

Sample still showing in quality inspection stock after usage decision completed

After process order completed, we have received 100 units as a quality inspection stock.  After usage decision,( QA11), I have posted 98 units to unrestricted use and 2 units to the  to sample usage98...

View Article

Report to change Inspection stage.

Dear Experts, I have this scenario. For example : Inspection stage is 40 Inspection severity is 6 We have 10 lots need to be passed to change to another stage and we tested 5 lots and it's ok. So do we...

View Article


QA32 MIC results field greyed

Dear Consultants, Results field for some of the MICs are greyed in QA32 and we are unable to put results. Kindly help. Regards,Ninad.

View Article


Defect Recording and Notification Creation

Dear Exerts, I have two question 1) When we  do defect recording it ask for level means you want to do defect recording at Inspection lot level or operation level or characteristics level.what is the...

View Article

SAP QM multiple measurements for an inspection characteristic

For QM in goods receipts inspection. We want to make 12 measurements on, let´s say, a wall thickness.  I want to make 12 measurements even when I have only one piece, and it´s the same piece.How to...

View Article

Problem facing during recording of QP01 in SHDB

Hi All My requirement is to mass upload of inspection plan and for this i am thinking of using BDC. But while doing recording in SHDB i am facing the following problem during MIC entry against...

View Article

Dump generated during UD, stock posting not completed

Hello All, I have an issue and I need all your support to resolve the same.I have an inspection lot for which UD is taken but stock is not getting posted. I want to return this stock to vendor, and the...

View Article


MIC at ILOT level and at Insp. Pt (Equipment) level

I have an ILOT generated from origin 14 with many Equipment using Object List Item tab in IP41. This IP41 uses Gen. Task List and Inspection Point 300 and has Insp. Char. For values to be updated from...

View Article

Modifying test results after the usage decision has been made?

Hi.  I have to put this question out there even though I'm pretty sure I know the answer.   Is there any way, user exit / creative workaround, to change inspection values once the usage decision has...

View Article


Report to change Inspection stage.

Dear Experts, I have this scenario. For example : Inspection stage is 40 Inspection severity is 6 We have 10 lots need to be passed to change to another stage and we tested 5 lots and it's ok. So do we...

View Article

work center selection during UD

harhe e Hi, We have the following scenario, Production guys confirmed order confirmation or make backflushing confirmation to update the WIP/FG stock, then quality cleared such stock through posting...

View Article


Certificate handling

Hello, Due to regulations of e.g. IATA it required that a certificate is linked to a material like a jet engine. This certificate is during the lifetime of the engine linked to it. But in some case it...

View Article

Stock still in QI after UD

Hello, I have used the move type 101 O (stock provided to vendor) and it did created the inspection lot as expected after activating the movement type for QM active however stock still in QI after UD...

View Article

Mass closure of notification and task

Dear All, In P system we have some 2+ years of backlogs of open notifications, I want to close them  (tasks and notifiation) in mass. Is it possible to close in mass? Because the data is huge which...

View Article
Browsing all 2825 articles
Browse latest View live


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>