I have the same material, 2 different vendors, QI info rec set up for each vendor, and calling for incoming inspection.
1 is set up for incoming inspection under our typical sampling plan / typical inspection characteristic.
I want to set up a new plan for the new vendor under more stringent sampling plan and a different characteristic.
I have created a different sampling procedure with tightened inspection for the second one with different lot sizes and sample sizes than the other sample procedure.
I have added a second operation or group counter on the existing inspection plan. The issue is ....When an inspection lot is created for this material, the system doesn't link any of the inspection plans to the inspection lot. I have to do that manually and select one of the inspection plan operations.
Is there a way for the system to pick one of the inspection plan operations automatically? Can it do it based on inspection lot size?
Any comments or feedback on this will be greatly appreciated. Thanks...