Hi,
I am trying to define a process for vendor approval for an external operation. We have service operations on our production orders and we are not using the 04 but only the 03 inspection type. Since the service operation is for account assignment F (production order) and does not have a material as a line item, how do I prevent the 101 goods receipt for the production order in case of an unapproved vendor was sent the service operation. Usually businesses do this as they have a vendor who is approved for other processes and hence the assumption is that he will eventually be approved and is good enough for an additional process. So they purchase at risk. If we had a 04 inspection type I could have given a one time skip MIC for the vendor approval and controlled it there. But since we dont have 04 inspeciton type how do I control this.
I am pretty sure this is a common scenario and someone on this forum might have had implemented this.
Thanks