Dear Gurus,
I was wondering if it was possible to revert a material which is in the skipped stage back to initial stage of the DMR on a particular date.
I have been through various threads and have realized that we can get it back to the initial stage say after X no. of skips or Y no. of days but I am looking for an option where I can cause a part no. to revert back to initial stage on say, 1st of August.
Please do let me know if this is possible in the standard process.
Thank you.
Sanila