Hi,
Please solve my following query.
Tanker receive to our factory for gross weight then QC draw sample and give there result, is material is approved it gets unload and after unload tanker come back for tare weight. So by initial gross weight and tare weight difference we get the Net weight of material in tanker.
After getting the net weight we do the GRN and material goes in quality stock and QC enter the result which was test initially (ie.,when the tanker arrives)
So our QC department say that they have to note down the results manually first on paper and circulate it for unloading and then after GRN they have to feed the manually tested result in system, this increase their work. So is there any system where we can bring the control and enter the result initially when tanker arrive for gross weight.
Also it would be helpful if you confirm me the current process which is been followed in various chemical industries for tanker unloading.
Note : We don't use batch number system.
Regards,