Hi,
have anybody an idea why I always have to select the phase, to start with the result recording?
My setting:
- inspection type 03 in master data
- inspection plan is assigned to recipe
- within my recipe I have one operation & and one phase (the production version is only using the phase, due tp PP-PI settings) the characterisitcs are assigned to my phase.
Doese anybody know why I always have to confirm the phase, before I can start with result recording?
Thanks a lot
Maike