Hello Experts,
I have a question regarding task lists and inspection plans:
I have run QP06.
I have hundreds of material numbers shown from the execution. The messages are:
No Inspection Plan Available and No Task list usage available for inspection type XX
but..... when I go into QP02,,, I see inspection type XX assigned and activated,
in MM02 I see Inspect w/tasklist activated
..... and when I manually create an insp. lot, it creates it....
My question, can you tell me why I'm getting these materials in a QP06 run and the materials look right in MM02, create and insp. lot, and activations ok?
Asked another way:
Can you explain the connection between QM tasklists and QM inspection plans?
Thanks
Verroz