Hi,
What should be the process for the following first question scenario's as we are not following standard SAP system like doing the GRN then inspection lots get generated, recording result and UD ?
First Question - Tanker arrives in our plant, weighment is been done on weigh-bridge and inspection is been done by quality department before GRN of material, if the material passes the quality then material is been GRN and material is been transfer to storage tank or else return back to vendor without doing anything in SAP. Then next tanker comes and same process is been followed.
Second question is that once the tanker has been unloaded in storage tanker then previous results lots get lost as material got mixed, so how to handle this too as there is no batch number system.
Regards,