QM gurus,
I am bringing interesting scenario, let me explain my inspection plans has been created on 01/03/2016 and Material revision valid from 01/03/2015. while doing MIGO lot has been created in CRTD status and plan not assigning to lot automatic or if try assign manual also. if I try without revision goods receipt inspection plan determining automatic ... let me know any settings is required for automatic determination of inspection plan.