Hi again everyone
I have been asked to update the "Insp. End Date" of a large number of Inspection lots as part of a project that is happening on-site.
I have done so through QA02 but I have been asked to do this twice already. However, I'm wondering if I'm asked again, is there a quicker way to update that field in a number of inspection lots at the same time.
I'm not sure if there is but you guys may have some tips on the most efficient way to do this.
Any tips would be greatly appreciated.
Thanks as always
Adrian