Dear Expert,
we using the stability study for the Quality inspection. all the Results are recorded for the all characteristics for all operations. it was seen in the transaction code QE03 that valuation done for the characteristics.
The sample shows valuated and the work center closed in QE51N, but QA11 displays the message: “Not all samples are valuated. Do you want to force completion?” Based on reviewing the inspection plans, the release work centers are set to auto-valuate.
when we are go to transaction code QA11 than at physical sample tab last operation not shown as valuation but Operation completion done for all the Operations.
please provide your inputs