Hi Experts,
Currently we are having one issue Could you please suggest on this.
1. We are having a material added with 01 inspection type and assigned with control insp lot as "For each material document item".
2. GR has done for a purchase order with 101 movement type for the material, plant and batch. Then one inspection lot get created with the material doc no.
3. In an other purchase order for the same material, plant and batch GR has done with 101 movement type with the same material doc no. for other quantity then again a new inspection lot get created with the same material doc no.
4. As per set up in material master QM view one inspection lot should create "for each material document item" but here for the same material document two inspection lots created.
Can you please suggest is there any setting need to do or the process is correct.
With Regards
Akash