Hi QM experts,
I am studying a scenario where I have inspections at work centers in production. These inspections are not related to an specific material or batch, but they check the conditions of work centers eventually and are of type OK, Not OK.
I am not sure about which is best option to define this process, but I think that to use inspection lots for equipment master records and with control type 89 (manual) may work.
Could you please advise me about this scenario?
Is there any option to inspect directly PP work centers instead of PM equipments?
Thanks and regards,
Marcos