We are mass migrating the Inspection plans to a different landscape, and I have so far migrated the inspection plans successfully,
However, I am having issues with migrating of the Q-Levels on Characteristics .
Interestingly when the Dynamic Modification on the task header is 3 (on the characteristic level ) other than without "skipped lots", the Quality Levels are migrated. However, when the combination of Dynamic modification rule 3 with "skip Lots", they don't migrate over.
Does that mean anytime the task header has "skip lot" they NEVER get migrated? I don't believe so..
Please advise.