Dear Experts,
I know from other threads in the site that expire batch can still be automatic blocked via T-code QA07 even the material is not active QM.
However, in my scenario, it seems doesn't work. Could you please help to check what's the problem here?
The mateiral is not active QM but active batch management. the process design is the material can be receved in "approved" (Unrestricted) status and when the batch expired, system can block it automatically.
we did below test:
1. Create an PO and perform GR via MIGO. the material is received successfully and a new batch X0004 is created. During GR, we manually input the manufacturing date and SLED/BBD as 14.10.2013 and 14.10.2015 (date of the testing day).
2. We then run T-code QA07 and input the material code, plant and batch. Since we didn't use QM for this material, we leave the second session for inspection lot blank. For third part for batch expiration checking, we input the initial run in days as 5 and have the block batch box checked. We then execute the programm and the system feedback message that "No entries found"
Do we miss any settings?
Thanks for your help.
Regards,
Fu Qiang