Quantcast
Channel: SCN : Discussion List - SAP ERP Operations - Quality Management (SAP QM)
Viewing all articles
Browse latest Browse all 2825

08 Stock transfer inspection lot creation if accepted 01 already exist

$
0
0

Hi all,

 

 

I would like to know if it is possible to generate the 08 inspection lot for a stock transfer between different plants (same material, batch,...) only if there isn't a 01 inspection lot with the UD taken and accepted in the initial plant linked to the batch. I supposed that it could be managed through configuration, but after check it I haven't found the correct way.

 

Thanks in advance,

 

Kind regards.


Viewing all articles
Browse latest Browse all 2825

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>