Quantcast
Channel: SCN : Discussion List - SAP ERP Operations - Quality Management (SAP QM)
Viewing all articles
Browse latest Browse all 2825

QM Notification, Transfer UR to QI with function in action box

$
0
0

Hi expert,

 

I try to create notification with transfer Unrestricted to Inspection Stock(action box) then i save notification system throw this message below

 

No inspection lot could be created

Message no. QM162

Diagnosis

The inspection lot could not be created, because no inspection lot is maintained for this material for inspection type 08 (inspection at transfer posting).

Procedure

  • Check in the material master (in the quality management view), whether inspection type 08 is maintained.
  • Check whether an inspection plan is assigned to the material.

 

but i already to created inspection plan(03 Universal) and inspection type 08 is already maintained.

 

How i solve to this case.

 

PS. my action box maintained

- Usage : Extended view (Create, Change )

   and : Notification

Documentation : As task

 

Function module : QMLR_CREATE_INSP_LOT

Icon : ICON_MOVE

Quick info : Transfer Post. Unrestr. -> Insp.


Code group : QM-G2

Code : 0020

 

FM when saving : QMLR_CREATE_INSP_LOT_STEP2

Completed : selected

 

Rules

(selected) : Only performed once


Viewing all articles
Browse latest Browse all 2825

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>