Hi All,
Is there any why to get the different Number range for difference insp.type(01 & Z01) with same insp lot origin.
Materials A & B,
For A we assign inspection type 01
Lot have to create & UD required .
For B we assign inspection type Z01
Lot have to create & UD not required
Requirement:
While GR the Material A then system have to create inspection lot with 10000 number range and GR for Material B then system have to create inspection lot with 560000 number range .
For third party interface identification purpose my client want this requirement.
I have searched all alternatives ways to fulfill the requirement,
Please let me know any body face this requirement.