Dear Experts,
I have activated the inspection type 01 and 0101 in material.
1. PO is created, thru QI07 inspection lot is created for 0101 and can be see in QA32. but nooo result recording & UD done.
2. After MIGO-GRN, another inspection lot is created for 01 Inspection type. For this Inspection lot, result recording and usage decision done
My question, why system is allowing to do Result recording &UD for Inspection type 01, as Inspection lot for 0101 is still pending, which is created before GRN. how to restrict that.
Regards,
Babar