Hi Experts,
We have a requirement of master inspection characteristics results to be made compulsory for those characteristics having an controlled indicator maintained as required.
Means, when I do result recording through QE51N system should allow me to save the document if I have not maintained the results in MIC having controlled indicator as "Required"
For Example:
If I have maintained 10 characteristics to the material through QP01 out of which 6 characteristics are having a controlled indicator as required and rest are "optional", then while doing the result recording system should give me an error if I have not mentioned the result for any of the 6 characteristic.
Or
It is also OK if the system allows me to save without entering results but it should not allow me to post the stock to unrestricted through QA11.
Best Regards,
Vijay Chavan